Thursday, 22 August 2013

ALT-C Presentation

The outcomes of the Smudie project are to be presented at the ALT-C conference in Nottingham in September. The slides for the presentation are shown below:

Monday, 13 May 2013

University Approves Smudie Project Outcomes

At a meeting chaired by Dr Nick Potter, Swansea Metropolitan approved and signed off the outcomes of the JISC Smudie project. Prof Tony Toole presented a final briefing paper that took the meeting through the integrated modelling process and the meeting discussed how it could be used early in a systems design process to systematically arrive at a fully evaluated design brief.



The meeting agreed that the modelling process could be a very valuable resource for the university as it completes the meger process that began during the project period. It was noted that all formal project requirements and deliverables had been completed and that a final online project cluster meeting was to follow immediately after the university sign-off meeting that would effectively bring the project to a close.

Thursday, 14 March 2013

Updated Case Study

The synthesis report presented in the previous blog posting, which used the student attendance monitoring process as an example of how modelling techniques can be applied in information systems design, is a key output of the Smudie project. Because of the institutional merger that took place during the project period, specific recommendations for improvements in the student information management system for the previous regime did not make sense. The outcomes of the project were therefore used to create a more generic set of recommendations that may well be more useful to the community of practice generally.

The Smudie project case study, which is also a key output, has been updated to reflect this change in emphasis and the potential benefits it offers. The case study is included with those of the other JISC Transformations projects on the programme website which can be viewed at https://jiscsupport-transformations.pbworks.com/w/page/50608449/Overview.

The updated case study is shown below:

Wednesday, 27 February 2013

A Synthesis of Modelling Techniques

As reported in this project blog, a number of modelling methods have been explored with a view to planning improvements in institutional student information management systems. The paper below is an attempt to bring together the key benefits of Soft Systems modelling, Viable Systems modelling and Enterprise Architecture modelling. It uses a case study to illustrate how the combination provides a much richer and informed picture for systems designers than each modelling method would provide individually.


Monday, 18 February 2013

Video Summary

One of the outputs for the Jisc projects in this programme is a brief video summary of the project for dissemination purposes. The video for the Smudie project is shown below. It describes how three different modelling approaches were used to analyse and develop the student information managment system at Swansea Met with a view to assisting the design of a new system following the merger with University of Wales Trinty Saint David.



Monday, 7 January 2013

Soft Systems Modelling

Previous posts have outlined the view that, when formally modeling organisational systems,the choice of modelling method or methodology brings important benefits, but each also brings its own constraints and limitations.

The JISC Smudie project has been exploring the use of Enterprise Architecture as a modelling tool and has shown that it is excellent as a way of visually representing the management systems and processes in an institution. The representations produced in the evaluation phase of the project showed how it readily identified anomalies and inadequacies in management structures and facilitated conversations about potential improvements.

This was followed by an examination of the affordances of Viable Systems Modelling which showed how it contributed the added dimension of management communications and control capacity as well as emphasising the recursive nature of management systems and sub-systems.

In the third analysis, outlined below, the principles and practices of Soft Systems Modelling were explored as a means of ensuing that the particular characteristics of human activity systems were taken into account when discussing systems improvements.


Monday, 31 December 2012

Viable Systems Modelling II

An updated version of the VSM report is presented below. The main changes are that, firstly, it is now in Word format and thus easier to access for people without a PDF reader, and it also expands on the benefits of VSM modelling in the conclusions section.

Friday, 21 December 2012

Viable Systems Modelling

As noted in earlier postings about management modelling methods, a combination of approaches can produce added value. Enterprise Architecture is excellent for visually presenting business processes, applications and technical infrastructures. However, Viable Systems Modelling brings in the additional dimensions of Requisite Variety and Recursion.
The paper below summarises how VSM recognises the need for independently viable management sub-systems that provide local communications and control capacity that balances the variable complexity across the organisation. The manager needs to be able to effectively communicate with the managed and the managed need to be confident that the manager knows how things work in practice.


Monday, 10 December 2012

Smudie Project Case Study

As noted in previous postings, the main deliverables planned for the Smudie project are this project blog and a detailed case study describing the project outcomes. The project blog is intended to provide a narrative account of the project activities, as well as provide access to all the project documents and outputs. The case study is a structured synthesis of the project achievements, outcomes and lessons learned. Both will be completed as the end of the project period approaches in 2013. However, a first draft of the case study has been created and is a useful reminder of the actions to be taken in the final phase of the project. The draft is shown below:


Smudie case study from Tony Toole

The case study is in the format set out on the programme website and this will be the formal project deliverable. However, a second version of the case study/report will be created for institutional management that summarises the 'nuggets' of effective practice identified by the project.

Wednesday, 21 November 2012

The 'to be' Modelling Plan

The document below outlines the 'to be' modelling plan for the Smudie project. As indicated in previous blog posts, it will be more generic than initially planned to account for the uncertainties surrounding the systems likely to be adopted by the newly merged institution. In that regard it is hoped it will be more transferrable to other institutions addressing similar issues.

Wednesday, 14 November 2012

Project Deliverables: Planning the Case Study

The deliverables for the Smudie project were planned to be a detailed case study describing the project outcomes, together with this project blog which comments on the issues and actions leading to the delivery of those outcomes.
Tony Toole met with Dave White, the JISC project Critical Friend, in Oxford yesterday and part of the (wide-ranging and very helpful) discussion covered the potential content and structure of the case study.
The discussion to some extent was a mini brainstorming session and really represented the start of the case study planning process. It took into account the institutional changes taking place through the merger between Swansea Met and Trinity St David and the uncertainties about the future information systems plans resulting from this. As noted in previous posts in this blog, it has already been decided that the original plan for specific systems recommendations would now be inappropriate and that more generic proposals would be more useful. In fact, the outcomes of the Smudie project may actually have greater impact now as they will directly inform an ongoing change process.
The issue that was discussed at the meeting was the possible structure and content of the case study. The general conclusion was that key operational areas/functional components of the information management system could be targetted. The idea of identifying micro case study 'nuggets' was explored where key areas for improvement, identified by the 'as is' evaluation, would be developed. The key areas would be identified as being typical (and thus generic) for any institution and the solution adaptable as a result.
The additional benefit to the generic approach would be that the outcome would not only be of use to the newly emerging instiution as it develops its merged system solutions, it would also be of greater benefit to the wider JISC community as a transferrable project deliverable.

The discussion also concluded that a 'nugget' based case study would be more effective for consideration by senior management than any detailed inclusion of the modelling methods used to arrive at the proposed solutions. It was felt, however, that the modelling process, particularly the multi-model approach that combines the benefits of EA, VSM and SSM, would be of interest to that specialist area of action research. It was agreed that the dissemination of that outcome would be a useful additional project deliverable.

Monday, 5 November 2012

The Practicalities of Management Modelling

EA modelling of management processes[1]  has a similar overall purpose to other modelling systems such as Checkland's Soft Systems Modelling[2] and Beer's Viable Systems Model[3],[4]. They use their own (typically) visual languages to map and describe management systems and processes with the common purpose of aiding conversations about improvement and optimisation.

A brief comparison of the similarities and differences between these three Human Activity modelling systems is worthwhile as it sets the context for the use of Enterprise Architecture in this particular exercise and indicates how EA modelling can be enriched by drawing in features from the SSM and VSM approaches.

The fundamental commonality is the recognition that they are all attempting to model human activity systems and that they will be fuzzy descriptors as a result. There is no attempt by any to eliminate the human variability factor, only to accommodate it and to exploit its strengths.

What SSM and VSM both bring to EA is what Checkland calls the world view and Beer calls the environment. It is easy with EA to concentrate just on the enterprise and its systems and miss the impact of the outside world when planning.

A further feature that VSM brings to the consideration of management systems is their recursive nature: smaller systems exist within larger systems, but each has the same control and communications profile. All institutions are agglomerations of self managing units within units.

It is also important to recognise that the fact that de-facto self managing systems will emerge to fill gaps in the management infrastructure that institutional senior management are likely to have no knowledge of. The current student attendance monitoring processes at the University provide several examples of such invisible localised management arrangements.


[1] http://www.jiscinfonet.ac.uk/infokits/ea/index_html
[2] Checkland, Peter B. & Poulter, J. (2006) Learning for Action: A short definitive account of Soft Systems Methodology and its use for Practitioners, teachers and Students, Wiley, Chichester.
[3] 1972, Stafford Beer, Brain of the Firm; Allen Lane, The Penguin Press, London, Herder and Herder, USA.
[4] 1989, Ed. Espejo and Harnden The Viable System Model; John Wiley, London and New York.

Thursday, 4 October 2012

Revised Project Schedule

With the changed status of Swansea Metropolitan University, the final stages of the JISC Smudie project have been re-scheduled to reflect the new institutional management arrangements and focus. The new merged university will be undertaking major structural changes that will not be complete by the time the Smudie project ends in July 2013. For this reason, the original plan to implement changes in the information management system based on the evaluation findings are no longer realistic. It is therefore proposed that the project outcomes, particularly the planned 'To Be' model, be structured as an advisory input to the discussions about the new institutional information management system. The expectation is that the final report and recommendations be of significant value in that process, and that the outcomes will be of equal value to other institutions in the JISC community planning similar developments. The revised schedule is shown below.

Wednesday, 3 October 2012

Development of the 'To Be' Model

This week has seen the beginning of a new era for Swansea Metropolitan University as it formally merged with University of Wales Trinity St David. To some extent the JISC Smudie project has been in preparation for this event and will contribute to management information systems planning for the new institution. The next phase of the project will use the conclusions drawn from the 'As Is' phase to develop a 'To Be' model that will seek to implement potential improvements in the new operating environment. The model will be based on information management components and on information management scheduling:

This will lead to the revision of information management workflows designed to deliver efficiencies and improved stakeholder support. In particular it is expected to make recommendations with regard to a single student record system and an institutionally managed student attendance monitoring and reporting system.

Wednesday, 22 August 2012

Third Evaluation Report: The Academic Viewpoint

The focus of this evaluation exercise was primarily on student information management by Academic Staff at the University. Three members of staff from each of the four Faculties were interviewed and the sample included Programme Directors, Year Tutors and Module Tutors. Further interviews were also carried out with IS staff, ADQs and Faculty Secretaries, as well as with staff in the Finance Department and the Students Union. Although additional interviews are planned with a selection of students during the Autumn term, and repeat interviews with selected staff to confirm some of the findings, this report largely completes the 'as is' evaluation phase of the project. The key message that emerged was that the academic engagement with the institutional student records system was periodic and mainly related to the reporting of assessment outcomes and attendance monitoring. It identified fact that day-to-day local records were kept by individual tutors and course teams and that these were used for formal reporting at appropriate points in the year. The important message for information management planning was that local record keeping processes were largely below the institutional management radar and that, although invariably aimed at providing optimal student support, varied considerably across the institution as a result. The next phase in the Smudie project will be starting to build a 'to be' model for student information management that takes all the evaluation messages into account. The intention is that it will be strategic in approach and technology independent; specifying the management principles that would ensure consistency and accuracy of information gathering and reporting.

Attendance Monitoring Report for Senior Management

The attendance monitoring, actioning and reporting mini-project within Smudie was completed and the outcomes discussed with the Vice Chancellor. This led to a request to present the findings to the University Senior Management team for discussion and decisions regarding future planning and actions. The presentation prepared for that purpose is shown below:

Monday, 23 July 2012

Information Management Review Meeting

A review of the information management system was held at the university on 13 July with a view to (1) updating all key stakeholders on developments and (2) planning for the next phase of development. Dave Smith, systems programmer, summarised all the developments and upgrades to the student records system and Chris Godsmark, MIS manager, reported on the external facing information communications, particularly the HESA returns. Tony Toole provided an update on the progress of the Smudie project and reported that the extensive stakeholder consultation phase of the project had been completed. He was in the process of documenting the outcomes and this would include a full 'as is' Enterprise Architecture model of the student information management system. Other diagramming outcomes of the process included a revised systems schematic which illustrated the range of external systems links (left hand side) and the internal information streams (right hand side).

Monday, 25 June 2012

Student and Institutional Information Management Systems

Below the top-level recording processes are the actions that the records trigger. These in themselves add to the information in the student records system and contribute metadata.

 


The map above shows the monitoring of both student academic attainment and attendance. The key feature of both is the combined outcome of Remedial Action. Discussions with all academic staff as part of the Smudie project had one very consistent feature: that all staff were focussed on student success and the support of them in their journey towards it.
Drilling down further takes the process towards the initiation of more formal University procedures:


Here the student record system is providing information that leads to follow-on action that both provides additional support for the students and provides essential data for the institutional management information system. It emphasises that the student information management system is only a sub-set (albeit a central one) to the overall institutional system.

An Enterprise Architecture Model of Attendance Monitoring

Enterprise Architecture modelling is being used by the JISC Smudie project to create process maps of student information management systems at SMU. These maps enable the system stakeholders to engage in informed conversations about the effectiveness of existing systems and to plan for improvements.
Often these maps present a picture of flexible and adaptable systems that recognise the different needs and contexts of the curriculum areas. This is no more apparent than in the top level systems map that emerged for student attendance monitoring.



It's a straightforward process involving the recording and reporting on students' engagement with their learning. However, this occurs in different ways ranging from formally and consistently timetabled lectures and practical classes to variable and negotiable sessions involving a high degree of student choice.
The University presently allows the curriculum areas to devise and manage their own attendance monitoring arrangements. The variation is illustrated in the systems map where the square white boxes are OR functions indicating choice. It can be seen that either the students or the tutor complete registers, that these registers are predominantly paper based (but not always), that the tutor transcribes these onto a spreadsheet (but not always) and that these are on common folders on the intranet (but not always).
The question that emerges from the analysis is whether the University is optimally served by this flexibility and can adequately meet its external reporting requirements. It is exactly this kind of question that the EA modelling is designed to invite.

Wednesday, 2 May 2012

Attendance monitoring spawns a mini-project

The previous post on attendance monitoring emphasised the need for a more consistent and time efficient way of gathering accurate data at the University. A technology based solution using student proximity cards has been trialled this term and the outcomes are to be discussed at a meeting on Friday.
However, it is not just data gathering that is a problem, it is also in the way that information is interpreted and made available to the various outside agencies who use it. The four main agencies are the Higher Education Funding Council, the Student Loan Company, HESA and the UK Border Agency.
The University is anxious to ensure the completeness and accuracy of student attendance data and the way it is interpreted and presented so that it can be confident that it is in compliance with legal and financial requirements. It is also keen that information in the public domain presents an appropriate picture of institutional performance.
For this reason, a mini-project has been launched to re-visit the information requirements of the agencies, not the least because they change their reporting requirements and arrangements from time to time, and to make appropriate changes to the University reporting procedures to achieve these outcomes.